Support for LAist comes from
Local and national news, NPR, things to do, food recommendations and guides to Los Angeles, Orange County and the Inland Empire
Stay Connected
Listen
Podcasts AirTalk
L.A. River revamp plans floated, River watchers think it doesn’t go far enough
solid blue rectangular banner
()
AirTalk Tile 2024
Sep 16, 2013
Listen 14:23
L.A. River revamp plans floated, River watchers think it doesn’t go far enough
The Army Corps of Engineers has chosen a plan to revitalize the Los Angeles River. The $453-million plan is the second cheapest of four options shortlisted in a feasibility study released Friday.
The Los Angeles River flows under the 6th Street Bridge in Los Angeles, California.
The Los Angeles River flows under the 6th Street Bridge in Los Angeles, California.
(
David McNew/Getty Images
)

The Army Corps of Engineers has chosen a plan to revitalize the Los Angeles River. The $453-million plan is the second cheapest of four options shortlisted in a feasibility study released Friday.

The Army Corps of Engineers has chosen a plan to revitalize the Los Angeles River. The $453-million plan is the second cheapest of four options shortlisted in a feasibility study released Friday. The plan, known as Alternative 13, would revitalize an 11-mile stretch of the river between Griffith Park and Downtown by removing concrete from the bottom of the river and widening it to create a freshwater marsh by Glassell Park.

RELATED: Report recommends greening 11 miles of the Los Angeles River for recreation and wildlife (PHOTOS)

The federal government will foot more than a quarter of the price tag, according to the Los Angeles Times. The city of Los Angeles will cover the rest. Environmental and advocacy groups don't think the plan chosen by the Corps goes far enough and are planning to push regulators to adopt and more comprehensive, albeit it more expensive, proposal.

The Corps will make its final recommendation after a 45-day public comment period. The project would need Congress' authorization before it could start, which could take years.

Guests:

Josephine Axt, Chief of Planning, Army Corps of Engineers, Los Angeles District

Omar Brownson, Executive Director, LA River Revitalization Corporation, a nonprofit created by the city of Los Angeles

Credits
Host, AirTalk
Host, Morning Edition, AirTalk Friday, The L.A. Report A.M. Edition
Senior Producer, AirTalk with Larry Mantle
Producer, AirTalk with Larry Mantle
Producer, AirTalk with Larry Mantle
Associate Producer, AirTalk & FilmWeek
Associate Producer, AirTalk
Apprentice News Clerk, AirTalk
Apprentice News Clerk, FilmWeek