Three unrelated problems may have combined to cause a disastrous oil-well blowout last month in the Gulf of Mexico. The blast killed 11 workers and is releasing massive amounts of oil into the gulf.
NPR's Richard Harris and Peter Overby tell Michele Norris that an NPR investigation finds questions in these areas: an apparent but undetected leak in the well itself; a decision on the drilling rig that inadvertently let gas rise from the well and burst onto the deck of the rig; and the failure of the well's blowout preventer to stop the chain of events.
None of these issues was in evidence the morning of April 20 on the Deepwater Horizon, which floated almost one mile above a sea-floor wellhead that capped a 13,000-foot well. The rig was owned by Transocean, which leased it to BP for this job. At about 2 a.m., contract workers from Halliburton finished pumping cement down the production liner, a steel tube that reached the bottom of the well. The cement capped the bottom of the well and came back up to enclose the liner. After an interval to let the cement harden -- "waiting on cement" in drillers' parlance -- the well was pressure-tested. It passed the tests.
Through that afternoon, the Deepwater Horizon crew prepared for the last two steps: setting a concrete plug near the top of the well and dealing with the riser -- the fat pipe connecting the rig to the wellhead.
The riser was filled with drilling mud -- a heavy, toxic, oil-based concoction used during drilling to lubricate the drill bit and carry waste from the drilling back up the pipe. Once the well reaches the oil reservoir, the drilling mud has another critical purpose: It acts as a cork to hold down the oil and gas pressing up the pipe.
Before the Deepwater Horizon could leave the well, the crew members had to displace the mud with seawater, so they could lay the riser down on the seafloor without dumping toxic drilling mud. Displacing can be done either before or after the cement plug is put in. It saves time overall to do it before setting the plug, but it's also riskier -- because seawater weighs less much less than drilling mud. The plug would provide another level of safety, a belt-and-suspenders approach.
Christopher Choy, a crewman on the Deepwater Horizon, told NPR's Joe Shapiro that the rig had encountered frequent problems with gas "kicking" up from this well.
"We'd taken little kicks previously," Choy said. "This well didn't want to be drilled. It just had problems from the start."
Displacement And The Blowout Preventer
But engineers concluded that with cement sealing the foot of the well -- a seal that passed its tests -- no gas or oil would flow up to cause a kick. The decision was made to displace the drilling mud before setting the plug.
Displacement began about 9 p.m. and proceeded smoothly for at least 30 minutes. But then there wasn't enough drilling mud to hold down oil and gas that had seeped into the well and mixed with the mud in the riser. The mud, made lighter by the gas, couldn't cork the well as it should have.
Another survivor of the Deepwater Horizon, speaking anonymously to radio host Mark Levin on his syndicated talk show, described the start of the eruption that followed: "It literally pushed the seawater all the way to the crown of the rig, which is about 240 feet in the air."
Drilling mud followed the water out of the pipe, covering the deck. Methane flowed out and apparently was sparked, setting off several explosions and the fire. Crew members who were near the pipe died. Others scrambled to lifeboats or leapt into the water.
Down on the seafloor was the last safeguard, the one device that could keep the reservoir from spilling its oil into the gulf: the blowout preventer, or BOP. It failed.
The BOP is a stack of several units, each one designed to stop blowouts in different ways. Here, the critical unit was the blind-shear ram. Simply put, its hydraulics would propel a big shear into the pipe, cutting the pipe in half and crimping it to stanch the flow. It appears that the shear jammed on a length of drill pipe that ran through it.
The shear may have lacked the power to cut through the drill pipe -- especially if it happened to hit a joint where two sections of drill pipe were connected -- or it may have been weakened by the counterpressure of the blowout itself.
It's also possible that stronger BOPs are needed to handle the superduty pipes used in modern deep-sea work. The federal Minerals Management Service, which overseas offshore drilling, hired a consultant to see if conventional BOPs could do the job. His answer: Maybe.
Copyright 2022 NPR. To see more, visit https://www.npr.org.
At LAist, we believe in journalism without censorship and the right of a free press to speak truth to those in power. Our hard-hitting watchdog reporting on local government, climate, and the ongoing housing and homelessness crisis is trustworthy, independent and freely accessible to everyone thanks to the support of readers like you.
But the game has changed: Congress voted to eliminate funding for public media across the country. Here at LAist that means a loss of $1.7 million in our budget every year. We want to assure you that despite growing threats to free press and free speech, LAist will remain a voice you know and trust. Speaking frankly, the amount of reader support we receive will help determine how strong of a newsroom we are going forward to cover the important news in our community.
We’re asking you to stand up for independent reporting that will not be silenced. With more individuals like you supporting this public service, we can continue to provide essential coverage for Southern Californians that you can’t find anywhere else. Become a monthly member today to help sustain this mission.
Thank you for your generous support and belief in the value of independent news.

-
Tens of thousands of workers across Southern California walk out over pay and staffing issues.
-
People in and around recent burn scars should be alert to the risk of debris flows. Typical October weather will be back later this week.
-
Jet Propulsion Laboratory leadership says the cuts amount to 11% of the workforce.
-
The rock legend joins LAist for a lookback on his career — and the next chapter of his music.
-
Yes, it's controversial, but let me explain.
-
What do stairs have to do with California’s housing crisis? More than you might think, says this Culver City councilmember.