Sponsored message
Logged in as
Audience-funded nonprofit news
radio tower icon laist logo
Next Up:
0:00
0:00
Subscribe
  • Listen Now Playing Listen
  • Listen Now Playing Listen

This archival content was originally written for and published on KPCC.org. Keep in mind that links and images may no longer work — and references may be outdated.

KPCC Archive

Weekend Traffic: Changes in Metro service, freeway closures on 10, 5 and more

Expo Line at 7th Street/Metro Center.
File: Expo Line at 7th Street/Metro Center.
(
File photo by Todd Johnson/KPCC
)

This story is free to read because readers choose to support LAist. If you find value in independent local reporting, make a donation to power our newsroom today.

Heads up, LA commuters:

The southbound 405 freeway will see a full closure between the 101 and Getty Center Drive off-ramp on Sunday from 2 a.m. to 7 a.m. The closure will not prevent access to the 101 freeway.

Included in the closure are ramps to and from the southbound 405 freeway:

  • Burbank Boulevard on-ramp
  • Ventura Boulevard on- and off-ramps
  • Valley Vista Boulevard on- and off- ramps
  • Skirball Center Drive on- and off-ramps 

Ramp closures will begin at 7 p.m. and lane closures will begin at 9 p.m. This closure was originally scheduled for Thursday but has since been postponed due to rain, according to a blog post in The Source, Metro's transportation blog.

I-10
  • Freeway Closure: Full closures of the 10 freeway near the Cherry Avenue overpass are planned through Saturday as part of the Cherry Avenue Interchange Improvement Project in Fontana. Read More
  • Ramp Closure at Tippecanoe Avenue: Eastbound 10 freeway off-ramp to Tippecanoe Avenue/Anderson Street will be closed starting Friday at 10 p.m. It is expected to reopen Monday at 6 a.m.

I-5
  • Freeway Closure: The southbound 5 freeway will be closed nightly between the 5 and 170 interchange and Sheldon Street from 11 p.m. to 4 a.m. through Dec. 20. Read More
  • Ramp Closure at Alondra Boulevard: Northbound 5 on-ramp closed at Alondra Boulevard for bridge demolition. Read More
  • Ramp Closure at EB/WB Tuxford Street: On-ramp closed at EB/WB Tuxford Street on southbound I-5 for shoulder reconstruction until the end of the year. Read More
  • Ramp Closure at Pioneer Boulevard: The southbound 5 off-ramp at Pioneer Boulevard/Imperial Highway will be permanently closed through April 2014. Read More
  • Ramp Closure at Imperial Highway: The northbound 5 off-ramp at Imperial Highway is permanently closed. Read More

I-405
  • Ramp Closure at Sunset Boulevard: Northbound 405 off-ramp to Sunset Boulevard is closed until Dec. 1. Read More
  • Freeway Closure: The 405 freeway experiences nightly closures at various locations in Los Angeles, such as a connector closure from the 101 freeway to 405 south. Click "Read More" to see if a closure might affect your commute this weekend. Read More
I-710
  • Ramp Closure at Olympic Boulevard: On-ramp closed at 710 SB at Olympic Blvd. for long-term bridge construction until 2014. Read More

SR-47
  • Lane Closure: Lane closure at New Dock Street to Henry Ford Blvd. on 47 north and south for bridge work until 2014. Read More
  • Ramp Closure at New Dock Street: On-ramp closed at EB/WB New Dock Street on Northbound 47 for bridge demolition until 2014. Read More

SR-2
  • Construction Update for 2/5 connector: The northbound 2 freeway connector to the northbound 5 freeway is closed due to damages sustained in a fiery tanker crash July 13. Construction repairs began Nov. 5. Read More

SR-39
  • Lane Closure: Lane closures at Crystal Lake Road on Northbound/Southbound 39 for permanent road closure of highway. Read More

I-215
  • Lane Closure: The north and southbound 215 will be affected by two lane changes and ramp closures between Mccall Blvd and Scott Rd until 2014. Read More

West County Connectors Project
  • Freeway Closures: The 405, 22 and 605 freeways in Los Alamitos and Westminster see nightly closures as part of the West County Connectors project, overseen by the Orange County Transportation Authority. Read More
Road Closure
  • Overland Avenue: Overland Avenue between Pico and National boulevards will be closed all weekend for construction on the Expo Line project. The closure begins at 9 p.m. Friday and ends at 6 a.m. Monday. Read More
  • Alondra Boulevard and Freeway Drive Intersection: The Alondra Blvd. and Freeway Drive intersection will be closed until Feb. 14, 2014. Alondra Boulevard Bridge will also be closed until mid/late 2014. Read More
  • Corner of Paddison and Zeus avenues: Adoree Street will be fully closed between Kalnor Avenue and the corner of Paddison and Zeus avenues through late February 2014. The corner of Paddison and Zeus avenues will also be fully closed. Read More
  • 1st Avenue and Santa Clara Street intersection: The intersection of 1st Avenue and Santa Clara Street in the City of Arcadia will be completely closed as crews start constructing grade crossing improvements. The intersection is expected to reopen in February 2014. (A temporary re-opening of the intersection is planned for a few days in early November 2013). Read More
  • California Avenue and Duarte Road intersection: As part of the 11.5-mile Metro Gold Line Foothill Extension light rail project, construction crews will work on the Southern half of California Avenue at the intersection of Duarte Road in Monrovia from 7 a.m. to 6 p.m. from Monday through Saturday until February 2014. California Avenue will be closed. For more details, click "read more." Read More

Metro and Metrolink Alerts
  • Metro Expo Line: Bus shuttles will replace Metro Expo Line service between La Cienega/Jefferson Station and Culver City Station on Saturday in order for Metro to perform planned track maintenance. Train service will only run between 7th St/Metro Center and La Cienega/Jefferson from 5 a.m. to 2 p.m. Read More
  • Metro Purple Line: The Metro Purple Line will only travel between Wilshire/Vermont and Wilshire/Western stations on Friday in order for Metro to perform planned track maintenance. Read More
  • Expo Line: Venice Blvd.: From 7 a.m. to 6 p.m. Fridays and 9 p.m. to 6 a.m. Sundays, expect reduced lanes along Venice Blvd. and Robertson Blvd. until January 2014. Read More
  • Santa Monica's Big Blue Bus: Due to Expo Line Phase II construction, Santa Monica's Big Blue Bus will temporarily close a number of Route 5 and Route 12 stops until further notice. Read More
  • Expansion of parking spaces at Metrolink Station: A new 176-space parking lot at the Laguna Niguel/Mission Viejo Metrolink Station opened to the public on Oct. 30. Read More

Bike Route Alerts
  • Coyote Creek Bike Path: Coyote Creek Bike Paths will be closed from Alondra Boulevard to Artesia Boulevard until May 2015. Read More
  • Los Angeles River Bike Path: The Los Angeles River bike path will be closed from Clara Street to Imperial Highway due to construction activities until Dec. 9. Read More

You come to LAist because you want independent reporting and trustworthy local information. Our newsroom doesn’t answer to shareholders looking to turn a profit. Instead, we answer to you and our connected community. We are free to tell the full truth, to hold power to account without fear or favor, and to follow facts wherever they lead. Our only loyalty is to our audiences and our mission: to inform, engage, and strengthen our community.

Right now, LAist has lost $1.7M in annual funding due to Congress clawing back money already approved. The support we receive from readers like you will determine how fully our newsroom can continue informing, serving, and strengthening Southern California.

If this story helped you today, please become a monthly member today to help sustain this mission. It just takes 1 minute to donate below.

Your tax-deductible donation keeps LAist independent and accessible to everyone.
Senior Vice President News, Editor in Chief

Make your tax-deductible donation today