Truth matters. Community matters. Your support makes both possible. LAist is one of the few places where news remains independent and free from political and corporate influence. Stand up for truth and for LAist. Make your year-end tax-deductible gift now.
This archival content was originally written for and published on KPCC.org. Keep in mind that links and images may no longer work — and references may be outdated.
710 freeway connector to close for 2 and a half years
A connector between the southbound 710 Freeway and westbound Ocean Boulevard will be closed beginning Saturday for the next two and a half years.
Crews need to demolish the ramp to make way for new connectors as part of the $1.2 billion Gerald Desmond Bridge Replacement Project.
Denis Wolcott with the Port of Long Beach says the connector closure shouldn't have a major impact on traffic during those 30 months, but commuters should still plan ahead.
"So motorists will be leaving the 710, getting off at Pico Avenue, using surface streets for just about a quarter mile, and then rejoining the freeway at Ocean Boulevard," said Wolcott.
The new bridge will be taller with a deck 205 feet above water. It'll include additional lanes, a higher clearance for taller cargo ships, and a bike path and pedestrian walkway. The bridge is expected to open in 2016.