Support for LAist comes from
Made of L.A.
Stay Connected

Share This

This is an archival story that predates current editorial management.

This archival content was written, edited, and published prior to LAist's acquisition by its current owner, Southern California Public Radio ("SCPR"). Content, such as language choice and subject matter, in archival articles therefore may not align with SCPR's current editorial standards. To learn more about those standards and why we make this distinction, please click here.

News

Metro Wants to Build Ped Tunnel Connecting Orange and Red Line Stations in NoHo

Support your source for local news!
The local news you read here every day is crafted for you, but right now, we need your help to keep it going. In these uncertain times, your support is even more important. Today, put a dollar value on the trustworthy reporting you rely on all year long. We can't hold those in power accountable and uplift voices from the community without your partnership. Thank you.

On Lankershim Boulevard between the Red and Orange Line terminal stations in North Hollywood, the crosswalk is pretty much always swarming, and the traffic backed up. In the spirit of problem solving born of lack of foresight, transit officials are only now looking into building an underground tunnel to link those two major transit hubs.

"The $22 million project would create a 150-foot below-ground passageway from the existing Orange Line bus platform to the mezzanine level of the Red Line subway, according to the Metropolitan Transportation Authority," reports the Daily News.

Count this project/solution with Metro-created issues like, gosh, let's see: Installing fare gates, getting a rail line all the way to the L.A. Airport, and making sure there's enough parking at Red Line stations like NoHo and Universal (the latter two of the issues still unsolved). How Metro did not forsee this issue and include building a bridge or tunnel for pedestrians across one of the biggest East Valley north-south Boulevards has remained a mystery to locals and transit users.

The Daily News interviewed commuters who see the same thing every day: People running across traffic on Lankershim to catch the Orange Line bus they see at the station on the other side of the street. It's especially bad during peak commuting hours, when the traffic also gets backed up on either side of Lankershim.

Support for LAist comes from

"Metro has applied for a $17.6 million federal grant that funds transit infrastructure projects. Metro would foot the remaining $4.4 million, according to officials," add the Daily News. If the grant goes to Metro when such funds are awarded mid-summer, the project could be completed by 2014.

Most Read